The Critical Path coverHIGHER GROUND · HIGH9CD
1 copy £161+ Shop →
the-critical-path-6cukj9 UK · 2000-03-13
1 — 11.3
  1. 1 Seldom Vile 5:12
  2. 2 Twister 4:49
  3. 3 L.E.D Down 4:37
  4. 4 Dissolve (In) 5:17
  5. 5 Dissolve (Out) 4:09
  6. 6 Supersport 3:47
  7. 7 Sort Code 5:45
  8. 8 Cable To Continue 4:54
  9. 9 Night Vision 5:44
  10. 10 Last Informer 5:14
  11. 11.1 On Condition (The Condition) 6:53
  12. 11.2 (silence) 1:00
  13. 11.3 Untitled 5:30
Liner notes

Track 11 lasts for a total of 13:23, and contains a hidden track (track 11.3). Track 11.1 lasts for 6:53 before a period of silence. Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production. ©2000 Sony Music Entertainment (UK) Ltd. Published by Chrysalis Music Ltd. All tracks ℗1999 except track five, ℗2000 Sony Music Entertainment (UK) Ltd. Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. Distribution Sony Music. Made in Austria.

Personnel
Arranged By [Strings]Noel Vine
Arranged By [Strings]Tipper
Artwork [Airbrush Art]Adrian Chesterman
DesignThe Designers Republic
Lyrics ByTipper
Producer, Written-ByTipper
StringsCity String Orchestra
VocalsSophie Barker
Matrix / Runout
Variant 1SONY MUSIC IFPI L551 S4946852000-2101 11 A2
Variant 2SONY MUSIC IFPI L551 S4946852000-0101 11 A2
Rights societyMCPS/BIEM/SDRM
Manufacture
Phonographic Copyright (p)Sony Music Entertainment (UK) Ltd.
Copyright (c)Sony Music Entertainment (UK) Ltd.
Published ByChrysalis Music Ltd.
Distributed BySony Music
Made BySony Music
Release UK · 2000-03-13 · CD, Album
Tipper

The Critical Path

Label
Higher Ground
Cat #
HIGH9CD
Country
UK
Released
2000-03-13
Style
Breakbeat, Abstract, IDM, Experimental
Format
CD, Album
Barcode
5099749468528
Rights society
MCPS/BIEM/SDRM
On the wall · 1 copy

Copies for sale

Prices exclude shipping
Every order is escrow-protected. Digr holds your payment until the record arrives as described — or your money back. How escrow works
Add to Wanted Add to Collection