HIGHER GROUND · HG 039
the-critical-path-1xozq1b UK · 1999
A1 — D1
- A1 Seldom Vile 5:12
- B1 L.E.D Down 4:37
- C1 Twister 4:49
- D1 Sort Code 5:45
Listen
Liner notes
Promotional sampler for [m=21046] album. Not for resale. 33 ⅓ RPM printed on labels, but this release plays at 45 RPM. Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production. Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. ℗ 1999 Sony Music Entertainment (UK) Ltd. © 1999 Sony Music Entertainment (UK) Ltd.
Personnel
Arranged By [Strings]Noel Vine
Arranged By [Strings]Tipper
ArtworkThe Designers Republic
Artwork [Airbrush Art]Adrian Chesterman
StringsCity String Orchestra
Written-By, ProducerTipper
Matrix / Runout
Side A, etchedHG 039 A1 FSV
Side B, etchedHG 039 B FSV
Side C, etchedHG 039 C FSV
Side D, etchedHG 039 D1 FSV
Rights societyMCPS/BIEM/SDRM
Manufacture
Phonographic Copyright (p)Sony Music Entertainment (UK) Ltd.
Copyright (c)Sony Music Entertainment (UK) Ltd.
Published ByChrysalis Music Ltd.
Pressed ByFSV
℗ 1999 Higher Ground
Digr Archive · the-critical-path-1xozq1b
Digr Archive · the-critical-path-1xozq1b
Release
TipperThe Critical Path
- Label
- Higher Ground
- Cat #
- HG 039
- Country
- UK
- Released
- 1999
- Genre
- Electronic
- Style
- Breaks
- Format
- Vinyl, 12", 45 RPM, Promo
- Rights society
- MCPS/BIEM/SDRM
One pressing of The Critical Path — master
Every order is escrow-protected. Digr holds your payment until the record arrives as described — or your money back. How escrow works